Note / Price varies according to the selected city
Price per participant, per week $2000
Register 3 participants on the same course and pay for 2 only
A large share of early equipment failures after a plant startup can be traced back to one thing: maintenance wasn't actually ready when operations began. Spare parts hadn't arrived, the CMMS wasn't loaded with accurate asset data, or job plans existed only on paper. This course walks maintenance, reliability, and operations teams through a practical method for making sure maintenance systems, people, and resources are genuinely ready before equipment is energised or handed over.
Delivered by Arab British Fellowship Training Academy as part of its Operations Readiness and Assurance Training courses within the Engineering maintenance and operation category, the course covers CMMS preparation, spare parts availability, preventive maintenance planning, asset records, and the coordination needed between maintenance, operations, engineering, and commissioning teams.
By the end of this course, participants will be able to:
Who Should Attend
Module 1: When Maintenance Isn't Ready, Risks and Warning Signs
Module 2: Building the Maintenance Readiness Plan
Module 3: Asset and Equipment Readiness
Module 4: Maintenance Strategy and CMMS Readiness
Module 5: Spare Parts, Tools and Materials Readiness
Module 6: Maintenance Procedures and Work Management
Module 7: Reliability and Asset Performance Readiness
Module 8: Maintenance Handover and Final Verification
Module 9: Maintenance Readiness Assurance and Continuous Improvement
Getting Maintenance Ready Before Startup: A Practical Training Course
2026-11-30
2027-03-01
2027-05-31
2027-08-30