Note / Price varies according to the selected city
Price per participant, per week $2000
Register 3 participants on the same course and pay for 2 only
Cost and time overruns are the norm rather than the exception on construction sites — a missed milestone here, an unmonitored critical activity there, and a project that looked fine on paper falls months behind. The Preventing Schedule Slippage: Construction Project Controls with Primavera P6 Training Course by Arab British Fellowship Training Academy tackles that gap directly, training professionals to build, protect and interrogate a construction schedule in Primavera P6 before problems become irreversible.
Offered under our Construction and Civil Engineering Training Courses, the programme walks through building a structured WBS and activity network, setting a defensible baseline schedule, tracking the critical path, loading resources realistically, and reading earned value data to catch drift early. Participants finish able to run delay analysis, build recovery schedules, and turn raw P6 data into reports that actually change site decisions.
Target Audience
Module 1: Why Construction Projects Fall Behind — And What Project Controls Does About It
Module 2: Structuring the Project: WBS, Activities and Milestones
Module 3: Building the Network: Relationships, Logic and Constraints
Module 4: Setting the Baseline and Reading the Critical Path
Module 5: Loading and Balancing Resources
Module 6: Tracking Reality: Progress Updates and Earned Value
Module 7: When the Schedule Slips: Delay Analysis and Recovery
Module 8: Reporting, Dashboards and Advanced Project Controls
Preventing Schedule Slippage: Construction Project Controls with Primavera P6 Training Course
2026-12-21
2027-03-22
2027-06-21
2027-09-20