Note / Price varies according to the selected city
Price per participant, per week $2000
Register 3 participants on the same course and pay for 2 only
Schedule slippage and budget overruns rarely come from one bad decision – they build up from a schedule that was never properly structured, costs that were estimated too loosely, or a lack of connection between the two. The Arab British Fellowship Training Academy designed this Project Scheduling and Cost Control course to attack that problem directly.
Participants learn to break a project down into a realistic schedule built on the critical path, estimate and control direct and indirect costs, and produce the financial reports that let managers catch deviations early rather than explain them after the fact. The programme closes by showing how scheduling and cost management reinforce each other, so participants leave able to defend both the timeline and the budget of a project with confidence.
Who Should Attend?
Knowledge and Benefits:
After completing the programme, participants will be able to:
Training Course in Project Scheduling and Cost Control
2026-10-05
2027-01-04
2027-04-05
2027-07-05